01A new product or revision
New steps, longer tests, a different routing. See which station it overloads before it reaches the line.
A discrete event simulation runs a week of production on your twin in seconds. Change a product, a cell or a shift, and watch throughput and the bottleneck move.
Get your plant simulatedThe line as it runs today.
Anything that changes how work moves through the floor.
New steps, longer tests, a different routing. See which station it overloads before it reaches the line.
Add a second cell where the queue builds and see what the week gives back.
Another shift, a shorter week, fewer people on a station.
A faster fixture, a slower supplier, a smaller buffer between two stations.
Move cells, add a line, plan the next building, and run it before anything moves.
The same numbers for every version, side by side, with the inputs behind them.
Supi answers what if questions from the same simulation, and shows the week it ran.
What happens if we release Drone X2 next week?
Camera calibration becomes the bottleneck at 100%. Output drops from 987 to 629 drones a week. A second calibration cell brings it back to 987.
Runs on Airsup Private. Answered from a simulated week.